Check the path
Your calculation audit
Every total is shown as a short sequence so you can see what was measured, deducted, adjusted and rounded.
- 01Awaiting valid measurementsComplete the fields above to reveal the formula path.
Landscaping & Boundaries
Estimate concrete volume and bags for a chosen number of circular fence-post holes.
Scope boundary: Materials volume estimate only — it does not set hole dimensions, post depth, ground treatment, drainage, stability or planning decisions.
Check the path
Every total is shown as a short sequence so you can see what was measured, deducted, adjusted and rounded.
Measure clearly
Count the post holes you intend to fill, then measure or choose the circular hole diameter and the intended fill depth. Keep the actual hole specification separate from this volume estimate.
Worked example
Ten circular holes at 300 mm diameter and 600 mm deep contain about 0.424 m³ before a 10% allowance, or about 0.467 m³ after allowance.
Before you buy
Count only the holes that will receive the selected concrete or post mix.
Use the intended fill depth, not an assumed typical depth.
Check the chosen product's bag yield and instructions before ordering.
Quick answers
Each hole is calculated as a cylinder, so volume rises with the square of the diameter. Use the actual chosen diameter rather than a nominal fence-post size.
No. It only estimates concrete volume for dimensions you provide. Ground conditions, frost, drainage, post stability and planning decisions need separate project-specific judgement.
Review record
Last reviewed: 2026-10-17. Formula version: v1.0. Classification: post-hole concrete estimate.
Formula source: src/calculator.js. Uses visitor-entered measurements and product values.