Every total is shown as a short sequence so you can see what was measured, deducted, adjusted and rounded.
- 01Awaiting valid measurementsComplete the fields above to reveal the formula path.
Walls & Masonry
Estimate concrete or screed volume from a rectangular pour, with practical bag rounding.
Scope boundary: Materials estimate only — not for foundations, footings, load-bearing work or structural design.
Check the path
Every total is shown as a short sequence so you can see what was measured, deducted, adjusted and rounded.
Measure clearly
Measure the inside length and width of the rectangular pour. Use the finished depth, not the depth of a trial hole or uneven ground.
Worked example
A 3 m × 2 m slab at 100 mm deep is 0.6 m³ before the selected waste allowance. The bag total is a purchase estimate, rounded up.
Before you buy
Use the intended finished depth across the full pour.
Check whether the supplier quotes bag yield or mixed volume.
Treat the result as material planning, not a structural specification.
Quick answers
Enter the finished pour depth that the project calls for. This calculator does not decide slab, footing or foundation depth.
Use it as a planning quantity, then check the exact yield, product instructions and pack availability before buying.