Check the path
Your calculation audit
Every total is shown as a short sequence so you can see what was measured, deducted, adjusted and rounded.
- 01Awaiting valid measurementsComplete the fields above to reveal the formula path.
Paving & Decking
Estimate paving slabs or deck boards from project area, material size, layout waste and packs.
Scope boundary: No structural, drainage or ground-preparation approval is provided by this materials estimate.
Check the path
Every total is shown as a short sequence so you can see what was measured, deducted, adjusted and rounded.
Measure clearly
Measure the finished patio or deck footprint. For decking, record board spacing as well as board size; for paving, set spacing to zero and add a layout allowance.
Worked example
A 12 m² patio using 600 × 600 mm slabs needs about 33.3 slabs before the selected cut allowance and pack rounding.
Before you buy
Measure the finished surface, excluding areas that will not be covered.
Use actual slab or board sizes, not nominal product names.
Confirm pack contents and layout cuts before ordering.
Quick answers
No. It estimates surface materials only and does not assess drainage, sub-base, supports, joists or structural loads.
For decking, use the intended board gap. For paving slabs, set the board-spacing field to zero and use the waste allowance for cuts.
Review record
Last reviewed: 15 October 2026. Formula version: v1.0. Source/review data to be added — Calculator.Shop does not present placeholder figures as an authoritative trade specification.